|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Home
| Site index
|
|
|
|
|
|
|
|
|
|
|
|
|
Prime
Machine has complete fab and production capabilities. The experienced
fabrication technicians are trained in
manual and
automated processes. This assures the highest quality
in repetitive parts, and the most common sense approach to unique projects. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
turning
23' ring section for positioner fabrication |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The
technicians are skilled in procedures for large part, close tolerance fabrication,
to conserve material costs and labor hours. They are also knowledgeable
with exotic materials and processes. |
|
|
|
|
|
|
|
|
|
|
|
All
types of fabrication and repairs using:
SAW - Submerged Arc Welding,
GTAW - Gas Tungsten Arc
Welding.
GMAW - Gas Metal Arc Welding,
SMAW - Shielded Metal Arc
Welding.
FCAW - Flux Core Arc Welding.
Welding
Standards:
AWS and ASME.
Experienced
in specialized metals:
High carbon / Alloy / Stainless
Steels.
Cast Iron.
Bronze.
Aluminum.
Titanium.
Monel / Inconel.
Hastaloy / Astroloy
Rotary
Positioner up to 12 Ton
15' Diameter.
Manipulators:
14' High 12' Travel.
14' High 8' Travel |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Automated
(sub-arc) build-up process
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
-
Ultrasonic / X-ray Inspection
-
Dye penetrant / Mag-particle
Inspection
-
Load Testing
-
Heat Treat / Stress Relieve
/ Anneal
-
Pre-heat / post-heat
-
Material Spectral Analysis
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fabrication
of 22' T-ring
|
|
|
|
|
|
|
|
|
|
|
Home
| Site index
|
|
|
|